Invitation for bids: Survey and Design Project of Flower House Girl Construction project in Santaishan National Forest Park

Update Time:2020/4/18 15:05:49Clicks:481Times
Suqian Santaishan Tourism Development Co., LTD. Santaishan National Forest Park Flower Girl construction project survey and design project has been approved by the relevant documents, the construction fund source is self-raised, has been implemented. …

Suqian Santaishan Tourism Development Co., LTD. Santaishan National Forest Park Flower Girl construction project survey and design project has been approved by the relevant documents, the construction fund source is self-raised, has been implemented. The project has met the bidding conditions, and now the survey and design project of the flower house girl construction project of Santaishan National Forest Park is open for bidding, and the winning bidder is selected.


1. Project overview and bidding scope


1.1 Project Location:


It is located in The Scenic area of Santaishan National Forest Park, Hubin New District, Suqian city


1.2 Project Scale:


The area of huafang Girls is about 11,511 square meters, which will be adjusted based on the existing foundation. Minimize the loss of the construction group guest hotel.


1.3 Design cycle: Survey report and scheme design results shall be submitted within 10 working days after the contract is signed, and construction drawings shall be submitted within 20 working days after the scheme design results pass the examination and approval (the above time does not include the examination and approval or examination time).


1.4 Quality requirements:


Meet the requirements of national technical specifications, standards and procedures, achieve the depth of the design requirements, and can pass the review of relevant departments.


1.5 Payment time and method of design service fee:


30% of the contract price shall be paid after the scheme is approved, 70% of the contract price shall be paid after the construction drawing is approved, and the balance shall be paid after the completion and acceptance of the project.


1.6 The bidding project is divided into one bidding section. The bidding section division and the relevant bidding contents are as follows:


Three greenhouse girl taishan national forest park construction engineering survey and design project (survey, the space of the building groups and single treatment, facade and the environment, accessibility, mechanical and electrical, landscape, energy-saving and intelligent design, selection of building structure, supporting facilities location, transportation network Settings, landscaping, etc), the construction drawing design, construction, structure, water supply and drainage, electrical, hvac, fire control, communications, intelligence, form a complete set of scheme and pipe network construction drawing design, etc.), high voltage design.


2. Method of Qualification Examination


The bidding for this project adopts the post-qualification examination, and the qualification examination method is: the qualification system.


3. The bid evaluation method


This project adopts bid evaluation method:


Comprehensive evaluation method


4. Applicant qualification requirements


4.1 Qualification category and grade of the bidder: A comprehensive Grade A qualification in engineering design or B class and above design qualification in the construction industry or B class and above design qualification in the construction industry (construction engineering);


4.2 Qualification level of the project leader to be selected: one level registered architect or one level registered structural engineer;


4.3 The project leader must meet the following conditions:


4.3.1 The project leader shall not be employed or practice in two or more units at the same time:


(1) Simultaneously sign labor contracts with two or more units or pay social insurance;


(2) To register my (job) qualification certificate in two or more units at the same time;


4.3.2 The project leader has no criminal record of bribery; Or if the bidder has a criminal record of bribery, but it has been more than 5 years since the record date (the statement of no criminal record provided by the bidder is in a self-prepared format).


4.4 the bidder's legal representative authorized agent, the project director must for this unit staff, and provided within 6 months prior to bidding in the bidding this unit to deal with any for a month for its endowment insurance pay proof, proof material can clearly reflect personnel name, pay, time and social security department seal etc. The presence of the legal representative is the same as this requirement.


4.5 Joint bid will not be accepted for this project.


4.6 The bidder shall not be under any of the following circumstances:


4.6.1 The tenderee is a subsidiary institution (unit) without independent legal person qualification;


4.6.2 Providing the supervisor, agent builder, project manager and tendering agency services for the tendering project;


4.6.3 If both the supervisor, agent and bidding agency of the project are legal representatives, or the two parties hold or participate in shares;


4.6.4 There is an interest relationship with the tenderer that may affect the fairness of the tender;


4.6.5 The person in charge of the unit shall be the same person or different units with shareholding and management relations;


4.6.6 The bidder is in the state of being ordered to suspend business, property being taken over, frozen or bankrupt, and the bidding qualification is cancelled or suspended and within the suspension period;


4.6.7 The contractor is restricted by the relevant department to undertake the project at the place where the project is subject to tender due to the delay in payment of workers' wages or the occurrence of quality and safety accidents;


4.6.8 The bidder has committed a bribery crime within the last 3 years and has been recorded, or the legal representative has a bribery crime record and has not been more than 5 years since the date of record.


4.7 Other conditions in compliance with relevant laws, regulations, rules and governmental normative documents.


5. Acquisition of bidding documents, drawings and other materials


5.1 Acquisition time of bidding documents: 8:30 on April 20, 2020 to 17:30 on April 24, 2020;


5.2 Acquisition method of bidding documents: on-site registration. (1) Copy of business license of enterprise legal person; Copy of qualification certificate; (3) The identity certificate of the legal representative or the letter of authorization of the legal representative for the project (original); Copy of id card of authorized client. The above materials are stamped with the official seal).


Contact: Li Xianguo Contact: 15312705353


Address: No. 299 Century Avenue, Suqian Economic Development Zone


Price of bidding documents: RMB 200 yuan per set, cash purchase, non-refundable after sale.


6. Submission of tender documents


6.1 Deadline for bidding: 14:30 on May 11, 2020;


6.2 Place of bid opening: conference room on the first floor of Suqian Santaishan Tourism Development Co., LTD.;


(West Entrance of Santaishan, former Santaishan Construction Headquarters)


Map search: Santaishan construction headquarters


6.3 The bidder shall submit the response document to the bid opening place before the response deadline (i.e., the response document submission deadline, the same below). The tenderer shall not accept the response documents submitted late.


7. The bidder is not accepted to participate in the bidding


8.1 The bidder has violated laws and regulations and is disqualified from bidding according to law and the time limit has not been reached;


8.2 The administrative department of bidding and tendering has published the restrictions and the time limit has not been reached due to the illegal and illegal behaviors in the bidding activities;


8.3 Other circumstances in which bidding is prohibited in accordance with relevant laws and regulations.


8.contact

Tenderee: Suqian Santaishan Tourism Development Co., LTD


Agency: Jiangsu Jiaxing Project Management Co., LTD


April 18, 2020


Tel:0527-84397888  Address:Intersection of Santaishan Avenue and Xinzhan Road, Hubin New District, Suqian City.

Copyright © Su ICP No. 2024080132 All Rights reserved All rights reserved:Suqian Santai Mountain Tourism Development Co., Ltd.

Su ICP No. 2024080132号   Historical visitors:3911114  

Follow the public account